This is the 34th report for the Storage Provider Working Group.
We went through Giza upgrade smoothly but are still behind the KPI 42.SP-1 - Maintain Storage System. See more explanations below
We still has an issue with usage of locally installed Query Nodes. It prevents the full launch of all SP nodes. @freakstatic has found out three workarounds. The final approval on which workaround to use is required from JSGenesis team .
7/9 storage operators upgraded their nodes
9/9 buckets were created
Following Giza upgrade, the report format to be adjusted next time
CPU: Intel Core i9 9900k, RAM: 64GB DDR4, Storage 3x960 Go SSD, Raid: 0 Stripping, Bandwidth: 1 Gbps
Cost: 83 USD
Query node: local
Upgraded to the Giza: yes
CPU: AMD Ryzen™ 7 3700X Octa-Core, RAM: 64 GB DDR4, 2 × 1TB SSD (RAID 0)
Helios:
Query node: local
Upgraded to the Giza: yes
CPU: 10 vCPU Cores, RAM: 60 GB RAM, 1.6 TB SSD, 1 Gbit/s Port, 32 TB Traffic (100 Mbit/s)
Cost: 38 USD
Query node: JSGenesis
Upgraded to the Giza: yes
10 vCPU Cores, 60 GB RAM, 1.6 TB SSD, 1 Gbit/s Port
Cost: 41.29 USD
Query node: JSGenesis
Upgraded to the Giza: yes
i7 6700 quad core, Ram : 64Gb,HDD: 2x2TB HDD
Cost: 60 USD
Query node: JSGenesis
Upgraded to the Giza: yes
Intel Xeon E3-1230v3 @3.30GHz DDR3 1600MHz 16GB Samsung 4TB SSD
Cost: 102 USD
Query node: no
Upgraded to the Giza: no
CPU AMD Ryzen™ 5 3600, RAM : 64 GB DDR4, HDD: 4TB, Connection : 1 Gbit/s
Cost: 50 USD
Query node: JSGenesis
Upgraded to the Giza: yes
Intel Core i7-6700 [4c/8t] (4.0GHz) / 64 GB DDR4 2666 MHz / 2 x 4 TБ SATA
Cost: 52 USD
Query node: no
Upgraded to the Giza: no
AMD Ryzen 5 3600; 12vCPU; 32 GB DDR4;
Cost: 50 USD
Query node: JSGenesis
Upgraded to the Giza: yes